Next LGA workshop: Mixed Model Line Design, Nov 10–12, 2026Reserve a seat →
by Leonardo Group Americas
Book a demo

Free tools · No login

Try the method in your browser.

Interactive demonstrators from our Mixed Model workshops. Change the inputs, run the line, and watch what happens to flow, inventory and lead time. Free to use, nothing to install.

Material flow

Push · Pull · Flow

Three sandwich shops, three material-flow strategies. Compare freshness, waste, stockouts and wait time, with a narrated guided tour.

Narrated

Flow

In-Process Kanban Flow

Two workstations, two workers. Watch how the rule between the stations changes throughput, WIP, blocking and starving, from no IPK to a kanban supermarket.

Material flow

Containerization Tool

Size bins so only full containers move to the line. Compare approved container sizes against your target inventory and hand-carry weight limit.

Balancing

Time Plus Inventory

Balancing Tool 5. A constraint station runs longer than takt: set the cycle times and shift, size the FIFO lanes, and watch added time drain them.

Balancing

Sequencing & IPK Lab

Balancing Tool 6. Five products with different work content share one line. Pick a sequencing strategy and the number of IPKs, then run the shift.

Machines

Three Machine Types on the Line

The same stream of units feeds three machines at the same takt and batch size. Only loading and unloading differ: see where inventory piles up.

Simulation

Simulation Model: Mixed Model Line

A discrete-event simulation of a leveled A-B-C line with feeder lines and IPK buffers, showing where blocking and waiting come from.

Narrated · English or Spanish

Want to see the same ideas on your own line? Book a demo of the Ezbelta Digital Twin, or learn the full method at Lean Design Studio.