Demand and product mix
Start from the customer: which products, in what volumes, and how the mix changes. The line is designed for the mix, not for one product.
The method
Mixed Model Manufacturing builds many different products on one line, in a level sequence, at the pace of customer demand. Instead of dedicated lines and big batches, the line is designed from the start for the mix, so variety stops being the enemy of flow.
Why it matters
Most plants make many products. Building them in large batches means long lead times, piles of inventory, and a schedule that is out of date the day it is printed. Adding a dedicated line for every product family costs floor space, capital and people.
Design first
Most lean programs remove waste after it has already been built into a line. Mixed Model Manufacturing designs the flow up front: the pace, the balance, the buffers and the material system are calculated before the line is built.
At a glance
| Traditional batch production | Mixed Model Manufacturing | |
|---|---|---|
| Product variety | Separate lines or long runs for each product | Many models built on one line, every day |
| Scheduling | Large batches pushed to a forecast | A level, repeating sequence at the pace of demand |
| Pace | Each machine runs as fast as it can | Every station paced to takt time |
| Imbalance between models | Absorbed by overtime, expediting and piles of WIP | Designed in: balanced work plus small, sized in-process kanbans |
| Material | Big stockrooms, forklifts, parts searched for | A plan for every part, delivered to the point of use on a route |
| Improvement | Kaizen removes waste after it is built in | Flow designed from the start, then improved |
Core ideas
Each idea is simple on its own. The power is in designing them together. Where we have a free demonstrator, you can try it in your browser.
Start from the customer: which products, in what volumes, and how the mix changes. The line is designed for the mix, not for one product.
The pace of customer demand: available work time divided by the units required. If a shift has 450 minutes and the customer needs 90 units, takt is 5 minutes. Every station is designed to that beat.
Try Time Plus Inventory ↗Each model's process is broken into work elements and timed. Different models carry different work content, and that difference is what the line design has to manage.
Work is spread across stations so each one fits takt across the whole mix, not just for one model. Where a model runs longer at a station, the design accounts for it rather than hoping it averages out.
Try the Sequencing & IPK Lab ↗Small, deliberately sized buffers between stations absorb the variation between models, so one long cycle does not block or starve the whole line.
Try the IPK Flow demonstrator ↗Instead of all of one model, then all of the next, models are mixed in a repeating sequence. Workload and material demand stay smooth, and every model is available every day.
A plan for every part: how it is packaged, where it is stored, how it is replenished by kanban, and how it reaches the point of use on a regular delivery route.
Try the Containerization Tool ↗The line builds what the customer has taken, and material is replaced as it is used. Inventory stops being a guess and becomes a designed quantity.
Try Push · Pull · Flow ↗How it is done
Where Ezbelta fits
Ezbelta tools encode Mixed Model Manufacturing as Leonardo Group Americas teaches and implements it. AI does the preparation; your team makes the decisions.
Go deeper